Project Insights

Scope of work: Income with our partner Ansaldo Energia successfully delivered engineering, procurement, and construction (EPC) services for steam turbines package

with generator and auxiliaries with a capacity of (1×250 MW) in Sidi Krir combined cycle power plant.

Client: West Delta Electricity Production Company

Summary on project: In partnership with Ansaldo Energia, the company successfully completed the Sidi Krir 750 MW Combined Cycle Power Plant for West Delta ElectricityProduction Company. The project involved the engineering, integration, and completion of a high-efficiency combined cycle configuration comprising gas turbine generators, heat recovery steam generators (HRSGs), and a steam turbine generator, designed to maximize thermal efficiency and operational reliability.

The project included coordination of multi-package interfaces, integration of power island and balance-of-plant systems, and compliance with contractual performance guarantees related to output, efficiency, and availability. The plant was delivered in accordance with applicable international standards, grid connection requirements, and utility operational criteria.